Interregation Game - Film 1

This film was made in a week and had to have a twist in it. My role in this film was camera assistant, gaffer and colourist

Vertical - Film 2

For this film it had to be shot in a vertical format. My role was sound/ boom op on this film.

H20 Landscape HD - film 3

This film was not story driven like the other it was driven by a piece of music, and had to show progression. My rode on this film was DoP/Cinematographer and colourist.

One shot/Long Take - film 4

This film had to be done in one long take, My role in this film was the editor it had a more editing than I was think there was going to be, seeing it was a long take/one shot.